The purpose at PNU Sewage Treatment Plant is to Treat the total raw sewage that will be collected from various university applications, both of suspended solids and biodegradable organic matters will be reduced through the treatment stages to an acceptable limit. The plant is capable to produce treated water that meets water reuse standards in volume and quality. All the treated effluent/water consumed are used for irrigation with an average of 3500 m2.
| A water well was drilled in order to carry out groundwater monitoring at PNU. This project is under development and its purpose is to establish the amount of groundwater in the well and treat this water for human consumption or for some activities on campus. Depth: 3-6 meters Diameter: 1.5 inch
|